CREG 097 PDF

Creg Uploaded by. Alexandra Rico. Loading Preview. Sorry, preview is currently unavailable. You can download the paper by clicking the button. resolucion creg de pdf merge. Quote. Postby Just» Tue Aug 28, am. Looking for resolucion creg de pdf merge. Will be grateful. This CREG Regulation establishes the following articles: The connection to to the network backup: CREG Resolution / – Energy supply: through a.

Author: Zulusar Arashilkis
Country: Papua New Guinea
Language: English (Spanish)
Genre: Medical
Published (Last): 21 January 2012
Pages: 37
PDF File Size: 10.33 Mb
ePub File Size: 14.10 Mb
ISBN: 510-2-24623-811-2
Downloads: 30053
Price: Free* [*Free Regsitration Required]
Uploader: Goramar

The economic impacts for customers who would not install DG units or passive customers were evaluated by a comparative method, that assesses the behavior of the crdg electricity bill of each one of those customers, for the two operation schemes without and with DG.

This module helps the operator with assigning a crew to an event outage caseand dispatch with a work order; initially to inspect, then to repair the fault or carry out maintenance. For simulating each of these periods, the iterative simulation procedure for years of analysis was applied. It was considered that the period of useful life of a DG plant corresponds to 20 years, regardless of the technology type used. The location of the estimated value of ITAD in the reliability incentives model involves certain economic impacts for the electric utility that must be quantified and analyzed.

Evaluating and comparing the electricity bill of each customer, for the two operation schemes with and without DG. The incentives scheme is complemented by a compensations scheme to ”worst served” customers, which seeks to reduce the dispersion of reliability supplied by 0977 electric utility around its mean reliability.

This reference period led to determining among others, the dead zone for the incentives scheme that is shown in Figure 5.

resolucion creg de pdf files – PDF Files

Finally, it applies this methodology to a distribution system and it identifies regulatory strategies when DG interconnection is not ceg. The preset number of iterations and variation coefficient for all the indexes are used as stop criteria for the simulation.

If reliability is worse than the dead zone boundary Z2a penalty is assessed. For example, these mechanisms must guarantee to customers, and that the times taken to recover investment costs due to the DG installation, are shorter or equal than those shown in Table 5 for the second study.

INTEGRATED SOLUTION | Energy Computer Systems

The crev acknowledgment ccreg DG inclusion in power systems and the incentives for optimizing energy resources has received great interest.

  A PRIMER OF FREUDIAN PSYCHOLOGY CALVIN S HALL PDF

Reliability evaluation techniques can be based on analytical methods or simulation methods Billinton, Jonnavithula, This impacts assessment allows through a balance between performance and costs, contribute to crg studies to connect these sources. Due to growing demand and concern over environmental pollution, new electricity generation with technological alternatives having the lowest impact on the environment is becoming a global reality. Distribution system reliability is evaluated in terms of the mean reliability supplied by an electric utility to its users, compared to its reference mean reliability.

The fault condition for a load point is defined if: Current and historic system reliability international indicators e. The location of DG units in the system customers. For each scheme, it is creh to model the distribution system considering three variables:. This is because the period of time defined for each Monte Carlo iteration is one year.

For simulating the first assessment period, the iterative simulation procedure was applied for the same operation scheme without DG which was executed for years of analysis.

This is because the application of the incentives and compensations scheme would cause some increases in the electricity bill of passive customers, which would be higher than the reductions in the bill due to the CU dg in most of the technologies is lower than the RC.

The economic impacts for DG owner customers were evaluated based on the time taken to recover the investment due to the installation of these plants. From Figure 6 it was observed that the oper ation scheme that does not consider the DG interconnection has a high ITAD dispersion around its mean value, however, implementing either of the two studies would reduce this dispersion in different proportions.

The customers who would install DG units would have a more detailed study, orientated towards calculating the estimated time for recovering investment costs due to the installation of these plants, according to crev technology used. Hence, some countries have modified their regulatory policies to promote the installation of DG systems, allowing such plants to become competitive compared to 079 generators. The feeder’s nominal voltage is For this application case, the distribution system does not consider the two in-line regulators, the in-line transformer and the shunt capacitors.

Conclusions The main contribution of this paper is the development of a methodology orientated towards estimating and analyzing the technical impacts, on topics of reliability, and the economic impacts that imply the DG interconnection, with the possibility of islanding operation, by customers of the distribution system. We proceed to determine the faulty component as the one with the lowest Tf. The regulatory scheme’s object is to ensure ongoing improvement reliability.

  EL ARTE DE PROYECTAR EN ARQUITECTURA ERNST NEUFERT PDF

These mechanisms should ensure to the customers that would install these generation sources, that the time to recover their initial investment is shorter or equal than the time calculated for that situation in which the DG capacity represents the peak demand of the respective plant owner. The characteristics of the DG units considered in each of these schemes are shown in Table 1.

This is because the price that could be negotiated between the customer and the electric utility, to improve the reliability, does not cover the additional investment that the customer would do by the purchase of additional generation capacity used as backup for the system.

The system registers the time dedicated to an event, the type of event, employed human resources and materials.

resolucion creg 097 de 2008 pdf files

This information is presented in Table 6. The first study implies the simultaneous installation of four DG units, located in the test crfg customers with the highest electricity consumption.

Then, crev assessment periods of the reliability supplied by electric ceg to its customers are simulated. The program creates statistics for each event, as for example: The main contribution of this paper is the development of a methodology orientated towards estimating and analyzing the technical impacts, on topics of reliability, and the economic impacts that imply the DG interconnection, with the possibility of islanding operation, by customers of the distribution system.

How to cite this article. This situation has mainly been guided by environmental statutes aimed at providing greater coverage, quality and better costs for customers. Electrical Model of Components and Demand: The proposed methodology was applied to the IEEE 34 node test feeder, from which it was concluded that the technical benefits of DG interconnection in distribution systems are very significant for both the electric utility and its customers.

This tool consisted of two analysis schemes: On the rceg hand, the second study considers the simultaneous installation of four DG units, located in the same customers with the highest demand.